1. TERM
Cementitious spray QA is the quality assurance process for documenting, inspecting, and verifying the application of cementitious fire protection coatings — such as vermiculite-based spray — to structural elements, producing individual workpiece quality records with thickness test data and photographic evidence.
2. PURPOSE
Cementitious spray coatings — including vermiculite-based products — are applied to structural steel, ducts, and other elements to provide passive fire protection through thermal insulation. The effectiveness of cementitious fire protection is directly dependent on correct application thickness and surface preparation. QA documentation demonstrates that these requirements were met at the time of application.
FireQA's Cementitious Spray QA module provides a structured system for recording each workpiece, capturing surface preparation checks, logging wet film and dry film thickness test results, and generating individual quality records — forming the cementitious QA package required for project handover.
3. SCOPE
Cementitious Spray QA applies to all structural elements, assemblies, or surfaces protected by cementitious fire protection coatings where a quality record is required for compliance, warranty, or handover purposes.
Each unique workpiece (identified steel member, assembly, duct section, wall, soffit, floor, or pallet) requires its own Cementitious Log. Where a workpiece has two different coating specifications — for example, separate interior and exterior systems — two separate logs are required.
4. COMPONENTS
Cementitious Log — one per unique workpiece; records specification, substrate, size, orientation, and a single coating specification
Surface preparation checks — QC checks with results and recommendations recorded before coating
Wet Film Thickness (WFT) testing — thickness recorded during application
Dry Film Thickness (DFT) testing — thickness recorded after curing
Photographic evidence — photos taken at multiple stages: before preparation, during application, and after completion
Workpiece details — item size, substrate type, orientation, and location
Individual Quality Record — generated per workpiece, documenting the full QA process
Floor plan annotation — annotated plans showing all workpiece locations with references
Audit workflow — daily or weekly audit reports on coating progress
Multi-user access — other trades or third-party auditors can be invited to specific work packages
5. OUTPUTS
Individual Workpiece Quality Record — per-item PDF record with all QC checks, thickness test data, and photos
On-demand register with photos — progress tracking of all workpieces
Annotated floor plans — showing all coated items with references
Daily / weekly audit reports
Full-size image set — all photographs taken at all stages
Final cementitious QA documentation package — full register with individual quality records, for handover to building owner or principal contractor
Excel export — all workpiece data in tabular format
6. RELATIONSHIPS
From
Relationship
To
Cementitious Spray QA
part of
FireQA
Cementitious Spray QA
produces
Cementitious QA documentation package
Cementitious Spray QA
operationalises
Passive Fire Compliance (structural coating elements)
Cementitious Spray QA
part of
Passive Fire Compliance
Cementitious Spray QA
enables
Passive Fire Certification — coating records form part of certification evidence
9. VERSION CONTROL
Version
1.0
Published
June 2026
Last updated
June 2026
Next review
July 2026
Owner
Clarinspect · fireqa.com